Solutions/InScope/Estimate

For owners who sign the PIP check

Know Your PIP NumberBefore the Brand Does.

The brand sends a 90-page PIP. Your consultant sends a spreadsheet six weeks later. Tanyx AI reads the PIP and your floor plans, then hands you a room-by-room budget built on Marriott, Hilton, IHG, and Hyatt standards. In minutes.

  • Marriott, Hilton, IHG, and Hyatt standards built in
  • AI drafts. Humans sign off.

Product demo

Faster project scoping
90%Faster project scoping
From PIP to budget
MinutesFrom PIP to budget
Manual takeoffs
ZeroManual takeoffs

The problem

Every Week of PIP Paralysis Shows Up in Your RevPAR.

Dark rooms earn zero. Rejected finishes cost twice. Middlemen take their cut before a single chair ships.

Six Weeks for a Spreadsheet

Consultants and purchasing agents return static numbers. Freight moves. Tariffs move. Your budget ages in the inbox.

The Brand Rejection Loop

Wrong finish. Wrong dimension. Back to the brand manager. Another round, another month of dark rooms.

The 60% Markup Nobody Mentions

Importers take about 25%. Resellers take 25%. Purchasing agents take 10%. That's 60% of your FF&E spend gone before a factory cuts a single board.

The solution

Tanyx AI Rewrites the PIP Math.

One platform. Your PIP goes in. A buildable budget comes out.

Drop in PIP + Floor Plans
Brand Standards Engine
Line-Item Budget in Minutes

InScope Estimate

Scope the PIP in Minutes

Drop in the PIP package or architectural PDFs. InScope reads room counts, casegoods, seating, lighting, and finishes, then delivers an itemized budget 80% complete before a human touches it.

Brand Standards

Brand Rules, Built In

Every line checks against approved spec books from Marriott, Hilton, IHG, and Hyatt. You submit clean the first time. The brand manager runs out of reasons to send it back.

InSpire Design

Design and Price at the Same Time

Test custom furniture against live factory pricing while the design takes shape. The beautiful idea and the budget agree from day one. No late-stage value engineering. No gutted concepts.

Explore InSpire→

Dual engine

The Brain Plans. The Factory Builds.

Use Tanyx AI to see the number. Plug into Inhabitr to hit it.

The Brain

Tanyx AI (Software)

What it does
Plans, estimates, bids, and tracks your capital spend.
What you get
Budget clarity on day one. Specs the brand accepts.
How it works
Reads PIPs and floor plans. Builds a line-item bill of quantities.
How you buy
Subscription or pay per PIP audit.

The Factory

Inhabitr (Furniture)

What it does
Manufactures, ships, and installs direct from the factory.
What you get
Up to 30% off CapEx. Turnarounds from 15 to 150 days.
How it works
Cuts out importers, resellers, and agents. Factory to your loading dock.
How you buy
Turnkey FF&E room packages.

Who it's for

Built for Everyone at the Table. Especially the Person Paying.

Owners & REITs

  • Know your landed cost first.

    Freight, tariffs, warehousing. All of it, before you sign a PO.

  • Get rooms back on the books.

    Shorter lead times put dark rooms back into inventory months sooner. Months mean ADR, occupancy, and NOI.

Operators & Management Groups

  • Run the job from your phone.

    Shop drawings, sample approvals, ocean containers. InView Manage tracks it all, 24/7.

  • One screen, three masters.

    Brand standards, owner budget, and factory schedule in one place.

Interior Designers

  • Keep the vision intact.

    Price custom casegoods and seating while you sketch.

  • Kill the 11th-hour cut list.

    The concept you present becomes the room you install.

Proof

30,000 Rooms Say It Works.

30,000+

Units furnished worldwide

1,000+

Hospitality projects delivered

Up to 30%

Saved on direct CapEx

15–150

Days from order to install

Where the work lives

  • Hilton Granite Park (Driftwood)
  • Cabana Hotel by Kimpton, Palo Alto
  • Sheraton San Jose
  • Voco Myrtle Beach
  • Starlite Hilton Tapestry, West Yellowstone

Testimonial

Why leading teams trust Tanyx

Inscope transformed our renovation planning process. What used to take days now takes minutes, giving our team a faster, smarter way to scope projects and build accurate budgets.
Portrait of David BuddemeyerDavid BuddemeyerPresident
Hotel lobby lounge with warm wood paneling, curved seating and tall windows

Case study

Hilton Garden Inn Miami Brickell South

Location
Miami, Florida
Planning completed
February 2026
Renovated guest room at Hilton Garden Inn Miami Brickell South with two queen beds, wood-look headboard wall and a window overlooking palm trees

AI-Powered PIP Review

Reduced manual document review by extracting renovation requirements directly from brand standards.

Budget Transparency

Automatically generated project budgets and quantity estimates for faster decision-making.

90% Faster Project Scoping

AI transformed hotel PIPs into actionable renovation plans in minutes.

Ready for Procurement

Structured project data flowed seamlessly into sourcing and procurement workflows.

Your PIP Is Already Costing You.Find Out How Much.

Upload your PIP or floor plans today. Walk into your next owner's meeting with a brand-compliant budget in hand.